0:08〜1:40(1 h 31 min)East Japan Railway Company (JR East) ・ Person struck by a train
リプレイ 列車・周辺のバスの位置を時刻を動かして見る
Chuo-Sobu Local: Due to a person being hit by a train on the Sobu Rapid Line, service is suspended in both directions between Chiba and Nakano stations.
- Notice versions
- 5
- Train delays for 千葉方面 (maximum / average)
- +94 min / +30 min
- Train delays for 三鷹方面 (maximum / average)
- +7 min / +1 min
- Nearby bus delay (max)
- ±0 min
- Bikes at stations (change from start)
- −230 bikes
Train delays show the largest delay in each direction among trains that were running during the disruption, and the per-minute average of delays (early arrivals count as 0).
Timeline
"Usual" (median of the same weekday and time over the past 4 weeks) appears once 4 weeks of records are available. Until then only this day is shown.
- ① 0:08 Chuo-Sobu Local: Due to a person being hit by a train on the Sobu Rapid Line, service is suspended in both directions between Chiba and Nakano stations.
- ② 0:10 Chuo-Sobu Local services are suspended in both directions between Chiba and Nakano stations due to a person being hit by a train on the Sobu Rapid Line. Service is expected to resume around 1:10. Times may change depending on conditions.
- ③ 0:28 Chuo-Sobu Local trains: Service is suspended for trains bound for Chiba between Nakano and Chiba stations due to a person being hit by a train on the Sobu Rapid Line. Service is expected to resume at around 1:10. Times may change depending on conditions.
- ④ 0:47 Chuo-Sobu Local trains: Due to a person being hit by a train on the Sobu Rapid Line, service is suspended for trains bound for Chiba between Kinshicho and Chiba stations. Service is expected to resume around 1:10. Times may change depending on the situation.
- ⑤ 0:54 Chuo-Sobu Local trains are suspended for trains bound for Chiba between Kinshicho and Chiba Station due to a person being hit by a train on the Sobu Rapid Line. The expected resumption time has been changed to around 1:30. Times may change depending on conditions.
Bikes by station
| Station (500 m radius) | Ports | At start | Lowest | Difference | Back to start level |
|---|---|---|---|---|---|
| Chiba | 21 | 96 | 65 | −31 bikes | Not yet |
| Nishi-Chiba | 8 | 14 | 11 | −3 bikes | 1:20 |
| Inage | 9 | 15 | 1 | −14 bikes | Not yet |
| Shin-Kemigawa | 11 | 8 | 8 | ±0 bikes | — |
| Makuhari | 11 | 75 | 75 | ±0 bikes | — |
| Makuharihongo | 5 | 21 | 16 | −5 bikes | 1:30 |
| Tsudanuma | 8 | 1 | 0 | −1 bikes | 0:30 |
| Higashi-Funabashi | 4 | 3 | 3 | ±0 bikes | — |
| Funabashi | 11 | 35 | 0 | −35 bikes | Not yet |
| Nishi-Funabashi | 12 | 10 | 0 | −10 bikes | Not yet |
| Shimosa-Nakayama | 4 | 7 | 1 | −6 bikes | Not yet |
| Motoyawata | 5 | 14 | 4 | −10 bikes | 1:50 |
| Ichikawa | 4 | 0 | 0 | ±0 bikes | — |
| Koiwa | 12 | 80 | 59 | −21 bikes | 1:50 |
| Shin-Koiwa | 12 | 14 | 2 | −12 bikes | 1:10 |
| Hirai | 4 | 24 | 1 | −23 bikes | Not yet |
| Kameido | 14 | 88 | 26 | −62 bikes | Not yet |
| Kinshicho | 19 | 43 | 18 | −25 bikes | Not yet |
| Ryogoku | 9 | 26 | 24 | −2 bikes | Not yet |
| Asakusabashi | 7 | 32 | 30 | −2 bikes | 1:20 |
| Akihabara | 19 | 80 | 63 | −17 bikes | Not yet |
| Ochanomizu | 9 | 41 | 38 | −3 bikes | Not yet |
| Suidobashi | 12 | 72 | 68 | −4 bikes | Not yet |
| Iidabashi | 7 | 34 | 32 | −2 bikes | 0:40 |
| Ichigaya | 8 | 21 | 21 | ±0 bikes | — |
| Yotsuya | 6 | 29 | 27 | −2 bikes | 1:30 |
| Shinanomachi | 7 | 9 | 6 | −3 bikes | Not yet |
| Sendagaya | 3 | 11 | 7 | −4 bikes | Not yet |
| Yoyogi | 10 | 15 | 12 | −3 bikes | Not yet |
| Shinjuku | 9 | 21 | 19 | −2 bikes | Not yet |
| Okubo | 17 | 32 | 24 | −8 bikes | Not yet |
| Higashi-nakano | 9 | 15 | 15 | ±0 bikes | — |
| Nakano | 9 | 6 | 2 | −4 bikes | Not yet |
At start = count when the disruption began. Lowest = count when it had fallen the most. Total of HELLO CYCLING and docomo bike share. Select a station name to see the number of bikes at each port on a map.
Nearby buses
| Route | Section | Flights | Delay (max) | Unusual |
|---|---|---|---|---|
| 渋63深夜 | 渋谷駅〜中野車庫 京王電鉄バス株式会社 | 1 | ±0 min | |
| 中10 | 中野駅〜丸山(営)10I 関東バス株式会社 | 22 | ±0 min | |
| 中20 | 丸山(営)〜中野駅20サ 関東バス株式会社 | 22 | ±0 min | |
| 中20−1 | 中野駅〜丸山(営)20サ 関東バス株式会社 | 88 | ±0 min | |
| 中35 | 中野駅〜五日市(営) 関東バス株式会社 | 58 | ±0 min | |
| 中45 | 中野駅〜丸山営業所:45 関東バス株式会社 | 11 | ±0 min | |
| 中野駅〜阿佐谷営業所N | 中野駅〜阿佐谷営業所 関東バス株式会社 | 11 | ±0 min | |
| 中野駅〜阿佐谷営業所S | 中野駅〜阿佐谷営業所 関東バス株式会社 | 66 | ±0 min | |
| 宿02 | 新宿西口〜丸山営業所 関東バス株式会社 | 77 | ±0 min | |
| 百01 | 高田馬場駅〜東中野駅西口 関東バス株式会社 | 22 | ±0 min | |
| 中41 | 中野駅〜江古田駅:41 関東バス株式会社 | 0 | — | |
| 中43 | 江古田駅〜中野駅(新道) 関東バス株式会社 | 0 | — |
Routes serving stops within 500 m of the stations. Trips and delays from the start of the disruption to 1 hour after it ended. Extra trips only when published as added trips in the feed. Select a route to see its delays every 10 minutes and its trip-by-trip records.
Walking this transfer (one example from the data)
Sendagaya Station ⇔ Kokuritsu-kyogijo Station
- Distance in the data
- about 226 m
- Step, slope and stair points
- 4
- Sections with unknown step/slope
- about 5 m
- Route in the data
- Underground section
- Sections with unknown step/slope
- Points with steps over 2 cm, slopes over 5% (ranks B–Z) or stairs
- 1Slope rank B (over 5%, up to 8%) about 2 m
- 2Slope rank B (over 5%, up to 8%) about 2 m
- 3Stairs about 16 m
- 4Stairs about 35 m
- Unknown section, about 5 m
Listed in route order (Sendagaya Station → Kokuritsu-kyogijo Station).
This is one example from the data, not a gate-to-gate route. The data is as of station surroundings 2021, station interior 2025. For actual transfers, check each operator's information.
The route starts on a street near Sendagaya Station and ends just outside the Oedo Line ticket gates at Kokuritsu-kyogijo Station. Sections with unknown step/slope have no record in the data (this does not mean there are no steps). Ranks follow the Pedestrian Network Data Specification (MLIT).
All disruption records ・ Operating record of this line
This is a record of what happened. It is not route or alternative-transport guidance.
Source: Public Transportation Open Data Center (East Japan Railway Company (JR East)・京王電鉄バス株式会社・関東バス株式会社・HELLO CYCLING (OpenStreet)・docomo bike share)
Transfer route (one example from the data): created by Tabinomemo by processing 「歩行空間ネットワークデータ(東京都渋谷区・渋谷駅、千駄ヶ谷駅周辺/東京都新宿区・新宿駅周辺)」・「歩行空間ネットワークデータ(都営地下鉄大江戸線 国立競技場駅)」 from Hokonavi (MLIT) (Public Data License (Version 1.0)).
The Association for Open Data of Public Transportation and the operators are not responsible for the accuracy or completeness of the data. Please do not contact the operators about it. For inquiries, contact Tabinomemo.