Sobu Rapid Line Funabashi〜Tokyo
0:08〜1:40(1 h 31 min)East Japan Railway Company (JR East) ・ Person struck by a train
リプレイ 列車・周辺のバスの位置を時刻を動かして見る
Sobu Rapid Line: Service is suspended in both directions due to a person being hit by a train at Funabashi Station.
- Notice versions
- 5
- Train delays for 上り (maximum / average)
- +94 min / +16 min
- Train delays for 下り (maximum / average)
- +38 min / +12 min
- Nearby bus delay (max)
- —
- Bikes at stations (change from start)
- −60 bikes
Train delays show the largest delay in each direction among trains that were running during the disruption, and the per-minute average of delays (early arrivals count as 0).
Timeline
"Usual" (median of the same weekday and time over the past 4 weeks) appears once 4 weeks of records are available. Until then only this day is shown.
- ① 0:08 Sobu Rapid Line: Service is suspended in both directions due to a person being hit by a train at Funabashi Station.
- ② 0:10 The Sobu Rapid Line service is suspended in both directions due to a person being hit by a train at Funabashi Station. Service is expected to resume around 1:10. Times may change depending on conditions.
- ③ 0:45 On the Sobu Rapid Line, service is suspended in the inbound direction due to a person being struck by a train at Funabashi Station. Service is expected to resume at around 1:10. Times may change depending on the situation. Outbound service has resumed.
- ④ 0:54 The Sobu Rapid Line is suspended for inbound trains due to a person being hit by a train at Funabashi Station. The expected resumption time has been changed to around 1:30. Times may change depending on conditions.
- ⑤ 1:02 Sobu Rapid Line: Due to a person being hit by a train at Funabashi Station, service is suspended on the inbound line between Funabashi and Tokyo stations. Service is expected to resume at around 1:30. Times may change depending on conditions.
Bikes by station
| Station (500 m radius) | Ports | At start | Lowest | Difference | Back to start level |
|---|---|---|---|---|---|
| Tokyo | 7 | 7 | 3 | −4 bikes | Not yet |
| Shin-Nihombashi | 11 | 24 | 24 | ±0 bikes | — |
| Bakurocho | 23 | 79 | 76 | −3 bikes | 0:50 |
| Kinshicho | 19 | 43 | 18 | −25 bikes | Not yet |
| Shin-Koiwa | 12 | 14 | 2 | −12 bikes | 1:10 |
| Ichikawa | 4 | 0 | 0 | ±0 bikes | — |
| Funabashi | 11 | 35 | 0 | −35 bikes | Not yet |
At start = count when the disruption began. Lowest = count when it had fallen the most. Total of HELLO CYCLING and docomo bike share. Select a station name to see the number of bikes at each port on a map.
Nearby buses
| Route | Section | Flights | Delay (max) | Unusual |
|---|---|---|---|---|
| 都02 | 錦糸町駅前〜大塚駅前 都営バス | 0 | — | |
| 都07 | 錦糸町駅前〜門前仲町 都営バス | 0 | — | |
| 東22 | 錦糸町駅前〜東陽町駅前 都営バス | 0 | — | |
| 両28 | 両国駅前〜葛西橋 都営バス | 0 | — | |
| 東42-1 | 東京駅八重洲口〜南千住車庫前 都営バス | 0 | — | |
| 都05-2 | 東京ビッグサイト〜東京駅丸の内南口 都営バス | 0 | — | |
| 東42-2 | 南千住車庫前〜東神田 都営バス | 0 | — |
Routes serving stops within 500 m of the stations. Trips and delays from the start of the disruption to 1 hour after it ended. Extra trips only when published as added trips in the feed. Select a route to see its delays every 10 minutes and its trip-by-trip records.
All disruption records ・ Operating record of this line
This is a record of what happened. It is not route or alternative-transport guidance.
Source: Public Transportation Open Data Center (East Japan Railway Company (JR East)・都営バス・HELLO CYCLING (OpenStreet)・docomo bike share)
The Association for Open Data of Public Transportation and the operators are not responsible for the accuracy or completeness of the data. Please do not contact the operators about it. For inquiries, contact Tabinomemo.